Demolition Expert
Showing posts with label Videos. Show all posts
Showing posts with label Videos. Show all posts
Thursday, 14 June 2012
Wednesday, 13 June 2012
Saturday, 9 June 2012
Do you trust engineers?
how much do u trust engineers?heres ur answer.
3D Visualization for the Civil Engineer Using Autodesk 3ds Max Design
See how Autodesk civil engineering customers use 3ds Max Design to
explore, validate, and communicate design concepts. Video clips from
Genivar, Parsons Brinkerhoff, 3d-MG, ARUP, Scott Wilson, Langan,
nc3D.com and URS Corporation are shown in this animation.
China Puts up a 30-Floor Building in 15 Days
Released by Broad Group is this video showcasing the fast turn-around
time for putting together a 30-floor high rise building after
factory-fabricating all the building modules in advance.
Broad Group, a private Chinese enterprise, consists of 4 distinctive companies each specializing in construction, air conditioning, air quality control and energy utilization. The Jack Welch' type CEO plus his wholly-owned subsidiary factories can turn out the pre-fabricated modules in a highly-efficient manner.
They're having several high-rise projects in the pipeline. Among one of the huge projects is a 200-floor skyscraper. FOUR months is all they need to assemble a 200-floor building claimed by Zhang Yue, the art teacher turned founder, chairman and CEO of Broad Group.
Broad Group, a private Chinese enterprise, consists of 4 distinctive companies each specializing in construction, air conditioning, air quality control and energy utilization. The Jack Welch' type CEO plus his wholly-owned subsidiary factories can turn out the pre-fabricated modules in a highly-efficient manner.
They're having several high-rise projects in the pipeline. Among one of the huge projects is a 200-floor skyscraper. FOUR months is all they need to assemble a 200-floor building claimed by Zhang Yue, the art teacher turned founder, chairman and CEO of Broad Group.
Civil Engineering: High rise construction and Form work
This video show how to efficiently manage the form works during the construction of buildings or structures.
WTF aluminum formwork is a rapid paced construction system for forming cast in place concrete structures. WTF provides aluminum formwork for reinforced concrete construction of single and multi-story buildings and enables the walls and slab to be placed monolithically in the same operation. This increases efficiency, and also produces an extraordinarily strong structure with excellent concrete finish.
WTF aluminum formwork is a rapid paced construction system for forming cast in place concrete structures. WTF provides aluminum formwork for reinforced concrete construction of single and multi-story buildings and enables the walls and slab to be placed monolithically in the same operation. This increases efficiency, and also produces an extraordinarily strong structure with excellent concrete finish.
Labels:
and,
civil,
construction,
engineer,
engineering,
form,
high,
rise,
Videos,
work
Concrete Forms Construction of Reinforced Concrete Walls
Reinforced concrete walls construction for building a house. The
Wall-Ties & Forms concrete forming system is helping concrete
contractors build quality concrete homes rapidly, and cost effectivly.
More concrete forming videos available at www.wallties.com.
Labels:
civil,
concrete,
construction,
engineer,
engineering,
form,
forms,
of,
reinforced,
Videos,
walls
A Day in the Life - Civil Engineer
A typical day in the life of a Civil Engineer.
50 Strangest Structures of the World
50 Strangest Structures of the World
COLMAR - T10000FSC Rail/Road Loaders (2005)
COLMAR rail/road loaders are used for the construction and maintenance of railway lines.
The machines can be equipped with different accessories: rail pincers, hydraulic or mechanical frame beam for moving sleepers;
tamping unit; pincers for different usage; hydraulic hammer; hydraulic bush-grass cutter.
COLMAR rail/road loaders are made of a strong electro welded steel and actionned by hydraulic systems realized with high quality
components.
The loaders are complete with security systems and are homologated to work in different countries.
The machines can be equipped with different accessories: rail pincers, hydraulic or mechanical frame beam for moving sleepers;
tamping unit; pincers for different usage; hydraulic hammer; hydraulic bush-grass cutter.
COLMAR rail/road loaders are made of a strong electro welded steel and actionned by hydraulic systems realized with high quality
components.
The loaders are complete with security systems and are homologated to work in different countries.
#PROJECT: "The world biggest hotel, the first 10-star hotel"
The world's biggest and first 10-star hotel!
Burj Khalifa (Burj Dubai) Construction - Animation - U.A.E.
Labels:
animation,
burj,
civil,
construction,
dubai,
engineer,
engineering,
khalifa,
u.a.e.,
uae,
Videos
4D Simulations - Civil Engineering Projects
Examples of InteliBuild Virtual Construction 4D Animations showing
excavation, temporary works, construction sequences. These videos are
created using Revit, AutoCAD, Navisworks and Maya animation software for
presentation.
InteliBuild use these processes to check planned construction sequences, identify build ability problems and assist contractors with planning of projects.
InteliBuild use these processes to check planned construction sequences, identify build ability problems and assist contractors with planning of projects.
Labels:
4d,
animation,
autocad,
civil,
engineer,
engineering,
project,
projects,
simulations,
Videos,
virtual
Wednesday, 6 June 2012
24.5Km – The world’s longest road tunnel in Norway
A marvelous civil engineering project depicting the world’s largest road tunnel
Tuesday, 5 June 2012
HongKong’s airport
The most complicated engineering project in history of civil
engineering,but with the power of iimagination and technical skills the
engineers made the impossible possible
Subscribe to:
Posts (Atom)